4008com云顶集团

Hello, welcome to Zhejiang Jie Li Da HVAC Technology Co., Ltd. official website!

Technical Support

Customer issues

You are here:Home > Customer issues
Name: *
Company name:
address:
tel: *
fax:
mail:
content: *
code: *
???
Frequently Asked Questions:
  • answer:As people live in contact with more product types, for the use of warm water is very common. In terms of the product, according to the performance difference, its product type is also varied, which is more common type there are two, one is the Korean version of the water separator, the second is the European version of the water separator. On the two different types of products, the performance difference in the end reflected in where? 1. Korean version of the water separator The product design concept is relatively simple, for the functional requirements are not high. The biggest feature of the product is because the structure is simple, the main way to control the main manual valve. Although the degree of intelligence is not high, but in the specific use of the reasons for the low cost so the market promotion rate is still considerable. 2. European version of the water separator In contrast, the work of the product will be a lot of fine, and in addition to the function is more perfect. Generally speaking, the product can not only control the flow, but also added a lot of human design elements, the use of more convenient. If, in general, the product can be described as complex structure, and the function is very powerful, very suitable for the popularization of modern needs. Today, a lot of the northern region for the warm product demand is very strong, so the application of such products have also increased demand. And the two products in the market competition with their own advantages, it is difficult to distinguish between what is better, can be regarded as different. Therefore, the majority of consumers, in the consumer for the product should also be more consideration of the above characteristics, according to their own preferences to make the right choice. Jie Lida supply water separator, sub-catchment, to the warm water separator, a variety of geothermal water separator, water separator, sub-catchment, to warm water separator, geothermal water separator information is also diverse, welcome your continued access!
  • answer:The main function is to connect the hot water from the piping system, through the buried in the floor below the warm coil to the need to heat the various indoor, So as to achieve the heating effect, is necessary to warm the heating equipment. The installation of the position of the water separator directly affect the heating effect inside the house, then, to warm the sub-water collector in the end installed in what place more appropriate? To achieve the best heating effect? Here for everyone to explain in detail. First of all, the location of the sub-catchment should be designed to facilitate control, maintenance, drainage pipes where the more appropriate. Not suitable for installation in the bedroom, living room, more suitable for installation in storage or cabinets. Second, the sub-catchment should be installed before the start of the installation of warm pipe. When the level of installation, the general water separator is more suitable for installation, the collector installed in the next, the center from the best 200mm, catchment center from the ground should not be less than 300mm, if the vertical installation, sub-catchment from the ground should not be the bottom Less than 150mm, remember to be installed horizontally. Third, for the semi-sub-layer of the room, sub-catchers suitable for installation at high or high places were installed, for the kind of complex structure units, sub-catchment suitable for installation in the upper and lower corresponding trunk on the trunk. Fourth, the water separator is recommended to place the central location of the house, you can reduce the heating control blind area, you can better control the length of each loop, each loop is more uniform. It is recommended to find a special place to place, but also for later maintenance convenience. Zhejiang Jie Lida Pipe Co., Ltd. water separator, sub-catchment, to warm water separator, geothermal water separator supply quality, worthy of your trust!
  • answer:Zhejiang Jie Lida Pipe Co., Ltd. will bring us what water separator, sub-catchment, to warm the water heater knowledge? Take a look at the following: 1, to warm the installation of the water heater must be qualified by the relevant professionals, after installation according to the standard requirements of the test pressure, and commissioned. 2, to warm the water separator to use a special fixed pieces, firmly fixed on the wall. 3, the pipeline to be installed back to the water should have sufficient position accuracy, forced connection to the coaxial deviation or deviation from the excessive deviation of the pipeline will produce excessive assembly stress, so that the warm water heater failure or damage. 4, sub-sump installation should be installed in the heating pipe before installation, but also in the laying of the pipeline filled with fine stone concrete with the valve, water meter installed together. Must be straight and firm, in the fine stone concrete before filling the need for water pressure test. 5, pipe thread connected to the valve, the installation should be tightened when the screw side of the hexagonal or octagonal parts of the thread, the wrench can not be directly applied to the shell. 6, when the level of installation, the ground will be installed in the warm water collector, the collector installed in the next, the center should be 200mm, the center of the collector from the ground for the 400mm. 7, should control the access to the warm water pipe end of the other parts of the size of the external thread, should avoid the use of unqualified or excessive tolerance of the product to match the product, so as not to cause damage caused by tough construction. 8, the heating pipe out of the ground to the floor of the warm water separator, the collector connection, the elbow part of the floor must not reveal the floor, heating pipe out of the ground using metal bending. Heating pipe out of the ground to the floor of the warm water collector, the lower part of the water pipe between the clear tube pipe, the external should be installed plastic casing (usually plus PVC PVC plastic pipe). Casing should be higher than the decorative surface 150-200mm. 9, to warm the pipe in the debris will increase the water resistance, while breaking the valve and pipe seal, so the import of pipe should be installed in the filter. Adjust the type of valve and automatic valve installation, but also in the installation before carefully read its instructions, according to the requirements of debugging. 10, heating pipe and sub-catchment of the siphon valve connection, should be used for special card sets of connectors or clamping fittings. 11, the butterfly valve and ball valve, too large closing speed will produce water hammer effect, so that the valve moment of pressure increased several times, may damage the pipe and valve, must pay attention. 12, to warm the installation of water after the installation of things to cover the side of the decoration when dirty. 13, the pipeline pressure or temperature fluctuations will reduce the valve and pipe life, should try to avoid. 14, after the completion of the installation of the system in the floor to the water heater with a label on the branch to indicate the direction of the branch. Winter heating facilities are increasingly becoming the main items of consumer decoration considerations, household heating era quietly coming, more and more consumers are looking more humane, more cost-effective, lower energy consumption to warm the warm water heater system heating Way, and the key to achieving consumer demand is to provide professional heating solutions, rather than simply eat big pot.

Home  |  Jie Lida water separator  | about us  |  Products  |  Download  |  Careers  |  Technical Support  |  contact us

浙ICP备10003325号 Zhejiang Jie Lida Pipe Industry Co., Ltd Contact: Li Yunhai mobile number:13606852630 phone:0575-87669088 fax:0575-87669008

Address: Zhejiang Province Zhuji City shop town Yang Yan Road Zip code:311835   Backstage management

XML 地图 | Sitemap 地图